Fujian Electric Power Engineering Co. Ltd

Project

Type of Work

unit

project leght/awarded

year

Power Grid Network Strengthening Project under PGCB. 2.04.5 LILO at Barapukuria (N) of Barapukuria -Bogra 230kV Double Circuit Line

Erection & Stringing Work

km

7.86

2023-24

Project

2.02.3 Bibiyana(S) to Sylhet(S) GIS 230kV D/C Transmission Line Under Power Grid Network Strengthening Project. Sylhet.

Type of Work

Erection & Stringing Work

unit

KM

Project lenght/awarded km

7.86

year

2023-24