Completed

our completed projects

Transmission Line Project

Kalpaturu Transmission Ltd.

Bogra - Ruhanpur 400kv Double Circuit & Associated 230 kv & 132 KV Transmission Line.

TBEA CO.LTD. CTG BRANCH

Design, Supply, Installation, Testing and Commissioning of 230 kV Transmission Line. PGCB/WB/ESPNERP/TL/PACKAGE-2. Korerhat to Chowmuhoni.

KEC International

Design, Supply, Installation, Testing and Commissioning of 230 kV Transmission Line. PGCB/WB/ESPNERP/TL/PACKAGE-2.Bogra to Kaliakoir.

Transrail

400 kV S/C Rooppur To Bogura Transmission Line.

ERA Construction

Sirajgonj 68 MW Solar-Park,132 kV Transmission Line Under BCRECL

TBEA CO.LTD. CTG BRANCH

Design, Supply, Installation, Testing and Commissioning of 230 kV Transmission Line. PGCB/WB/ESPNERP/TL/PACKAGE-2. Korerhat to Chowmuhoni.

TBEA CO.LTD. CTG BRANCH

Design, Supply, Installation, Testing and Commissioning of 230 kV Transmission Line. PGCB/WB/ESPNERP/TL/PACKAGE-2. Korerhat to Chowmuhoni.

TBEA CO.LTD. CTG BRANCH

Design, Supply, Installation, Testing and Commissioning of 230 kV Transmission Line. PGCB/WB/ESPNERP/TL/PACKAGE-2. Kachua to Chowmuhoni.

ERA Construction

Sirajgonj 68 MW Solar-Park,132 kV Transmission Line Under BCRECL

GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH OFFICE OF THE EXECUTIVE ENGINEER EDUCATION ENGINEERING DEPARTMENT

Horizontal (Toilet Block) & Vertical Extension works (1st & 2nd Floor) of Existing Academic Building Including Sanitary, Water Supply & Electrification Works at DHOLADIA HIGH SCHOOL at Sreepur Upazilla, Gazipur District.

TBEA CO.LTD. CTG BRANCH

Design, Supply, Installation, Testing and Commissioning of 230 kV Transmission Line. PGCB/WB/ESPNERP/TL/PACKAGE-2. Korerhat to Chowmuhoni.

CCC ENGINEERING LTD

Power Grid Network Strengthening Project under PGCB 132kV F/C Line. PGCB/GtoG/01. Taraganj of Saidpur - Rangpur

Fujian Electric Power Engineering Co.,Ltd

Power Grid Network Strengthening Project under PGCB. 2.04.5 LILO at Barapukuria (N) of Barapukuria -Bogra 230kV Double Circuit Line

Building Construction Project

Centre for the Rehabilitation of the Paralysed (CRP)

Construction of 1st phase(semi+basement+GF) with Eight Storied Foundation of Proposed CRP-Moulvibazar, Afsarul & Aktarul Haque Centre

Mozaffor & Brothers Ltd

Construction of 12-Storied Building with 2-Basement (HDM Tower) at 31, Katalganj, Chottogram.

Urmi Group

Purbachal Farm House, Dhaka
// Farm House //

Chittagong Port Authority

R/M of R.C.C Container
//Construction of R.C.C Container//

Chittagong Port Authority

R/M of R.C.C Container
//Construction of R.C.C Container//

Warehouse Project

Chittagong Industrial Park Ltd

Commercial Warehouse (17000SFT) at Rashid Building, Strand Road, Chittagong.