Scroll

Ongoing

our ongoing projects

Transmission Line Project

Fujian Electric Power Engineering Co.,Ltd

Power Grid Network Strengthening Project under PGCB. 2.04.5 LILO at Barapukuria (N) of Barapukuria -Bogra 230kV Double Circuit Line

Fujian Electric Power Engineering Co.,Ltd

2.02.10 Barisal(N) - Patuakhali 230kV new Double Circuit Line Twin ACSR Mallard: 55km

Fujian Electric Power Engineering Co.,Ltd

2.04.6 Lilo at Madhobdi of Ghorashal-Rampura by 230kV FC TL :1km